Type C:
Total
pool/spa removal, with engineered backfill and oversight by a soils engineer during backfill and compaction process. This
method is necessary if any future construction over the site, or within five feet of the site, is contemplated, and when dictated
by local code.
The entire
pool is to be removed from the site. All of the gunite, or fiberglass, or vinyl, and plaster, tile and coping are to be removed
from the site. A soils engineer will be hired to engineer the backfill, which Bjurman Corporation will install to the engineer's
specifications. Average price for engineering has been about $2000.00.